Laserfiche WebLink
• . <br /> Owner City of Clive Project NW 114th St. - South - Division 1 <br /> CHANGE ORDER NO. 3 <br /> To McAninch Corporation , Contractor <br /> You are hereby ordered to make the following change from the approved plans and specifications of <br /> the above project. <br /> 1. Description of change to be made: <br /> A. Remove unstable subgrade between Sta. 5 +00 to Sta. 10 +50 on NW 114th St. to <br /> depth of 1' below subgrade, rework and compact next 1' of subgrade with <br /> moisture and density control as specified. Replace and compact top 1' of <br /> subgrade with moisture and density control as specified. <br /> • <br /> 2. Reason for change: <br /> A. To correct unstable subgrade in cut section. - <br /> 3. Settlement for the cost of making the change shall be as follows: <br /> A. Estimated Excavation Quantity: <br /> 2,300 CY @ $2.18 /CY = $5,014.00 <br /> 4. This change will result in a net (increase oKflX&r.hitel in the cost of the project of $ 5,014.00 <br /> , <br /> divided as follows: <br /> Local Govt. <br /> Approved funds as per (ffii XX.Xillit4CS1ifidet; <br /> last approved C.O.) $ 1,447,112.10 $ <br /> Change due to this C.O. (+ or -) $ + 5,014.00 $ <br /> Totals including this C.O.: $ 1,452,126.10 $ <br /> Date <br /> Engineer <br /> The change described herein is understood, and the terms of settlement are hereby agreed to. <br /> Owner's Authorized Rep. Title Date <br /> Contractor's Authorized Rep. Title Date <br /> • <br />