Laserfiche WebLink
/9/9')//71 <br /> introduced the following <br /> Resolution entitled "RESOLUTION ADOPTING PRELIMINARY PLAT AND <br /> SCHEDULE, ESTIMATE OF COST AND PROPOSED PLANS AND <br /> SPECIFICATIONS FOR THE CONSTRUCTION OF THE CLIVE, IOWA, PUBLIC <br /> IMPROVEMENT PROJECT, 1986 (114TH STREET) - DIVISION TWO - STORM <br /> SEWER" and moved its adoption. - P,T �l , // seconded <br /> the motion to adopt. The roll was called and the vote was, <br /> AYES: 4>(6fiYjj/ L / /, `1)� /t/l. 0/kZ <br /> • 2 / r -/ <br /> NAYS: /1 :VI <br /> Whereupon, the Mayor declared the resolution duly adopted <br /> as follows: RESOLUTION ADOPTING PRELIMINARY PLAT AND 4 <br /> SCHEDULE, ESTIMATE OF COST AND PROPOSED <br /> PLANS AND SPECIFICATIONS FOR THE CONSTRUCTION <br /> OF THE CLIVE, IOWA, PUBLIC IMPROVEMENT PROJECT, 1986 <br /> (114TH STREET) - DIVISION TWO - STORM SEWER <br /> WHEREAS, this Council has caused to be prepared preliminary <br /> plat, schedule and estimate of cost, together with plans and <br /> specifications, for the construction of the Clive, Iowa, Public <br /> Improvement Project, 1986 (114th Street) - Division "Two - Storm <br /> Sewer, and this Council has fixed the valuations of the pro- <br /> perty proposed to be assessed as shown therein; and <br /> WHEREAS, the Council finds that each lot separately <br /> assessed in the schedule of assessments meets the definition of <br /> a lot as described in Iowa Code Section 384.37(5) or in the <br /> case of lots consisting of multiple parcels, that the parcels <br /> have been assembled into a single unit for the purpose of use <br /> or development; and <br /> WHEREAS, said plat and schedule, estimate of cost and plans <br /> and specifications appear to be proper for the purpose inten- <br /> ded: <br /> NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE <br /> CITY OF CLIVE, IOWA: <br /> That said plat and schedule, estimate of cost and plans and <br /> specifications be and the same are hereby adopted as the pro- <br /> posed plat, schedule, estimate of cost and plans and specifica- <br /> • - 9 <br />