Laserfiche WebLink
• • <br /> RESOLUTION NO. 9` g <br /> .RESOLUTION APPROVING PROPOSED CONSTRUCTION BY IOWA POWER OF A <br /> 345 KV TRANSMISSION LINE LOOP PROJECT <br /> WHEREAS, Iowa Power has proposed the construction of a 345 kV <br /> Transmission Line Loop Project beginning near Patterson, Iowa to the existing <br /> east/west transmission line north of Altoona, Iowa; and <br /> WHEREAS, the project will complete a loop around the eastern edge of the Des <br /> Moines Metropolitan area and construct substations for the delivery power; and <br /> WHEREAS, the project will increase the ability of Iowa Power to insure a reliable <br /> and flexible system to meet the future electrical demands of the greater Des Moines <br /> Metropolitan area; and <br /> WHEREAS, the proposed project coupled with other improvements such as the <br /> IDOT Relocated US 65 Project will enhance the potential for future economic growth <br /> and development, the creation of jobs, and the enhancement of the greater <br /> metropolitan area; and <br /> WHEREAS, Iowa Power will apply for a franchise to the Department of <br /> Commerce in June of 1991 and if successful, will construct the segment in Madison <br /> and Warren County around mid 1992 to 1994 and will construct the Polk County <br /> segment during 1994 through 1996. <br /> NOW, THEREFORE, BE IT RESOLVED that the City of Clive, Iowa <br /> supports the construction and installation of the Iowa Power 345 kV Transmission Line <br /> Loop Project. <br /> Project. <br /> PASSED AND APPROVED THIS 11TH DAY OF JULY, 1991. <br /> 1 ►� 1 r. ! <br /> MAY9R <br /> ATTEST: <br /> �- `J ' � t , CITY CLERK <br />